Fuel Cell Caravan - The Home of the Future
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
No Result
View All Result
Fuel Cell Caravan - The Home of the Future
Home NEWS

Hyundai Heavy, Vestas tapped for Gray Whale 3 floating wind project

admin by admin
November 11, 2023
in NEWS
0
Hyundai Heavy, Vestas tapped for Gray Whale 3 floating wind project
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

[ad_1]

Korean shipbuilding company HD Hyundai Heavy Industries Co Ltd (KRX:329180) has been selected as the preferred bidder for the engineering, procurement, and construction (EPC) of the Gray Whale 3 floating offshore wind project in South Korea’s waters.

The appointment was made by BadaEnergy, a joint venture (JV) between Corio Generation, TotalEnergies SE (EPA:TTE), and SK ecoplant, which is promoting the Gray Whale 3 project as part of a 1.5-GW floating wind development off the coast of Ulsan.

Hyundai Heavy Industries has extensive experience in the construction and fabrication of offshore plants such as FPSO (Floating Production Storage and Offloading) and platforms, BadaEnergy said.

Denmark’s Vestas Wind Systems A/S (CPH:VWS) has been selected as the preferred wind turbine supplier for Gray Whale 3, it was unveiled in the same announcement.

In March 2023, Vestas issued a brief press release to say it had been chosen to supply 33 units of its V236-15.0 MW turbines for a 495-MW floating wind project in South Korea. Details about the project and the customer were withheld at the time.

“We are honored to have been selected as the preferred turbine supplier and collaborate with BadaEnergy and HHI for the Gray Whale 3 floating offshore wind project. We will deliver the unparalleled competitiveness of Vestas’ technology combined with our experience in floating wind project execution to make sure an optimal deployment of offshore wind and strengthen customers’ business case for the project,” said Srdan Cenic, Country Manager of Vestas Korea & Vice President, Head of Sales Offshore of Vestas Asia Pacific.

The Gray Whale 1, 2 and 3 wind farms will be located in public waters some 60 kilometres (37.3 miles) east of Ulsan Port. BadaEnergy aims to start phase construction from 2025 and begin the first commercial operation in 2028.

The JV says that the Gray Whale complex is expected to be one of the world’s largest floating offshore wind farms once its third phase is finalised.

Choose your newsletter by Renewables Now. Join for free!

[ad_2]

Source link

LET’S KEEP IN TOUCH!

We’d love to keep you updated with our latest news and offers 😎

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Tags: Corporate Contracts South Korea Machinery/Engineering Turbines/Power Equipment Wind Power Offshore Wind
Previous Post

BMW 7 Series to get Level 3 driving assistance next spring

Next Post

Toyota Camry Hybrid AWD, $35,000 VW EV, Polestar 5 tech, Air charging EVs: Today’s Car News

Next Post
Toyota Camry Hybrid AWD, ,000 VW EV, Polestar 5 tech, Air charging EVs: Today’s Car News

Toyota Camry Hybrid AWD, $35,000 VW EV, Polestar 5 tech, Air charging EVs: Today’s Car News

Recent Posts

  • Huawei and BAIC’s first luxury EV coming in April
  • Here’s The Rivian R3 Driving Around Laguna Beach
  • Blazer EV price cut, Dodge electric muscle, Rivian R2 and R3: The Week in Reverse
  • Tesla’s Supercharger struggle – short cables and awkward parking for non-Tesla EVs
  • Tesla Is Working On A NACS-To-NACS Extension Cable

Recent Comments

No comments to show.

Fuel Cell Caravan

Mobile Home Office

Useful Links

  • Terms
  • About
  • Privacy Policy
  • Refund
  • Contact Us
  • News
  • Blog

connect with us on

Facebook Twitter Youtube Linkedin Instagram Whatsapp
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us

© 2023 FuelCellCaravan - All Rights Reserved