Fuel Cell Caravan - The Home of the Future
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
No Result
View All Result
Fuel Cell Caravan - The Home of the Future
Home NEWS

France awards 1-GW offshore wind challenge, pre-selects bidders for two websites

admin by admin
March 27, 2023
in NEWS
0
France awards 1-GW offshore wind challenge, pre-selects bidders for two websites
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


France’s Minister for Vitality Transition Agnes Pannier-Runacher on Monday introduced steps to speed up offshore wind improvement within the nation and unveiled the winner of a tender for a 1-GW challenge off the coast of Normandy.

The challenge, Centre Manche 1, was awarded to Eoliennes en Mer Manche Normandie, an organization of EDF Renouvelables, a unit of French utility Electricite de France SA (EPA:EDF), and Maple Energy, a UK-based offshore wind developer, which is a three way partnership between Canada’s Enbridge and Canada Pension Plan Funding Board (CPPIB). The challenge was awarded at a aggressive value, which signifies the maturity of the offshore wind sector, in line with the official announcement.

The transfer means France now has 4 GW of offshore wind initiatives below improvement. The Centre Manche 1 wind farm, or AO4, is anticipated to be commissioned in 2031.

As well as, the minister introduced lists of chosen events who will take part within the aggressive dialogue for two offshore wind initiatives, a scheme off the Oleron island within the Atlantic (AO7) and a second challenge off Normandy (AO8), of 1 GW and 1.5 GW, respectively. These initiatives will likely be allotted originally of 2024 and are seen to return onstream in 2032.

The names for AO7 are Ocean Winds; a consortium of Corio Era and Qair Eolien Pose Oleron; a consortium of EDF Renouvelables and Maple Energy; RWE; Iberdrola; Oceole; Eni Plenitude; a consortium of TotalEnergies and Jera Energy; and Skyborn-Cobra.

For AO8, the pre-selected bidders includeg an alliance shaped by Vattenfall, Skyborn Renewables and Banque des Territoires; a consortium of EDF Renouvelables and Maple Energy; Ocean Winds; a consortium of TotalEnergies and RWE; Iberdrola; a consortium of Corio Era and Qair Eolien Pose Manche; and Eni Plenitude.

The federal government additional suggested of the upcoming publication of specs for the 250-MW floating offshore wind challenge in southern Brittany (AO5), which is because of be allotted on the finish of 2023.

France, which opened its first utility-scale offshore wind farm, the 480-MW Saint-Nazaire, final 12 months, goals to put in 40 GW of offshore wind capability by 2050.

In assist of this goal, Agnes Pannier-Runacher additionally launched a session on accelerating the competitors procedures and on the strategies of public assist for offshore wind farms. This may run until June 12.

Select your e-newsletter by Renewables Now. Be a part of free of charge!





Supply hyperlink

LET’S KEEP IN TOUCH!

We’d love to keep you updated with our latest news and offers 😎

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Previous Post

Tesla Dashcam Captures Insane Accident The place A Kia Takes Flight On The Freeway

Next Post

All-electric Mercedes CLA is coming in 2025 to compete with Tesla Mannequin 3

Next Post
All-electric Mercedes CLA is coming in 2025 to compete with Tesla Mannequin 3

All-electric Mercedes CLA is coming in 2025 to compete with Tesla Mannequin 3

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Rivian CEO explains why spectacular Tank Turn mode is a no-go
  • Spain’s Opdenergy narrows net loss in Q1 2023 as revenues swell
  • Mercedes-Benz EQE SUV goes on sale in China, way cheaper than EQS SUV
  • Crown Estate to update on Celtic Sea leasing after review of spatial issues
  • Tesla Customers Going For Mercedes, Porsche EVs After Cancelation Of RHD Model S And Model X

Recent Comments

No comments to show.
fuel cell caravan

Fuel Cell Caravan

Mobile Home Office

Useful Links

  • Terms
  • About
  • Privacy Policy
  • Refund
  • Contact Us
  • News
  • Blog

connect with us on

Facebook Twitter Youtube Linkedin Instagram Whatsapp
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us

© 2023 FuelCellCaravan - All Rights Reserved

×