Fuel Cell Caravan - The Home of the Future
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
No Result
View All Result
Fuel Cell Caravan - The Home of the Future
Home NEWS

Vitol orders Vestas turbines for 139-MW US repowering project

admin by admin
June 18, 2023
in NEWS
0
Vitol orders Vestas turbines for 139-MW US repowering project
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


Danish wind turbine manufacturer Vestas Wind Systems A/S (CPH:VWS) has secured a 139-MW order from Vitol to repower a project owned by the energy and commodities trader in Pennsylvania.

Vestas said today it will provide 68 units of its V110-2.0 MW turbine in 2.05 MW operating mode, with delivery scheduled to begin in the second quarter of 2024. The turbines, expected to be commissioned in the fourth quarter of 2024, will replace the project’s existing Senvion MM92-2.05 MW wind turbines.

The contract covers supply, delivery and commissioning of the machines, as well as a 20-year service agreement.

Laura Beane, President of Vestas North America, said the project is another collaboration between Vestas and Vitol to extend the production lifespan of aging fleets with customised solutions for specific site conditions.

Vitol announced a deal to acquire 244.4 MW of wind farms in Pennsylvania in April 2022.

Choose your newsletter by Renewables Now. Join for free!



Source link

LET’S KEEP IN TOUCH!

We’d love to keep you updated with our latest news and offers 😎

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Previous Post

Tesla’s NACS EV fast-charging standard lags in locations vs. CCS

Next Post

Tesla Celebrates 10 Millionth 4680-Type Battery Cell At Giga Texas

Next Post
Tesla Celebrates 10 Millionth 4680-Type Battery Cell At Giga Texas

Tesla Celebrates 10 Millionth 4680-Type Battery Cell At Giga Texas

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Huawei and BAIC’s first luxury EV coming in April
  • Here’s The Rivian R3 Driving Around Laguna Beach
  • Blazer EV price cut, Dodge electric muscle, Rivian R2 and R3: The Week in Reverse
  • Tesla’s Supercharger struggle – short cables and awkward parking for non-Tesla EVs
  • Tesla Is Working On A NACS-To-NACS Extension Cable

Recent Comments

  1. binance on Nordex’s 2022 order consumption drops to six.3 GW
  2. mostbet_kg_uvPn on Masdar signs agreements for up to 8 GW of renewables in Malaysia
  3. Danielmyday on Man pleads not responsible to alleged bashing homicide of journey companion behind artwork gallery
  4. znachki na zakaz_mlSn on Masdar signs agreements for up to 8 GW of renewables in Malaysia
  5. stroitelnoe vodoponijenie_pdOt on Masdar signs agreements for up to 8 GW of renewables in Malaysia

Fuel Cell Caravan

Mobile Home Office

Useful Links

  • Terms
  • About
  • Privacy Policy
  • Refund
  • Contact Us
  • News
  • Blog

connect with us on

Facebook Twitter Youtube Linkedin Instagram Whatsapp
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us

© 2023 FuelCellCaravan - All Rights Reserved

Social Chat is free, download and try it now here!