Fuel Cell Caravan - The Home of the Future
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
No Result
View All Result
Fuel Cell Caravan - The Home of the Future
Home NEWS

First turbine installed at SSE’s 101-MW Irish wind project

admin by admin
January 18, 2024
in NEWS
0
First turbine installed at SSE’s 101-MW Irish wind project
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter

[ad_1]

UK utility SSE plc’s (LON:SSE) renewables arm announced today that the first of 29 turbines has been successfully installed at its 101-MW Yellow River Wind Farm in central Ireland.

The facility, which will be equipped with N117/3600 machines provided by German manufacturer Nordex SE (ETR:NDX1), is on track to be connected to the grid in early 2025, SSE Renewables noted in a statement.

Turbine delivery is set to continue until April, with the installation works expected to be completed by the end of the summer.

SSE Renewables bought the project, located in Rhode, County Offaly, in December 2019.

Once operational, Yellow River will produce enough renewable energy to meet the electricity needs of 66,000 homes. The project has won a contract for the entire capacity under the Irish Government’s latest RESS 3 auction round for new onshore wind farms.

Choose your newsletter by Renewables Now. Join for free!

[ad_2]

Source link

LET’S KEEP IN TOUCH!

We’d love to keep you updated with our latest news and offers 😎

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Tags: Capacity Ireland Electricity Generation Wind Power Onshore Wind
Previous Post

Lucid Discounts The 2023 Air Sedan By Up To $10,000

Next Post

2024 Hyundai Kona Electric N Line debuts with sportier looks

Next Post
2024 Hyundai Kona Electric N Line debuts with sportier looks

2024 Hyundai Kona Electric N Line debuts with sportier looks

Recent Posts

  • Huawei and BAIC’s first luxury EV coming in April
  • Here’s The Rivian R3 Driving Around Laguna Beach
  • Blazer EV price cut, Dodge electric muscle, Rivian R2 and R3: The Week in Reverse
  • Tesla’s Supercharger struggle – short cables and awkward parking for non-Tesla EVs
  • Tesla Is Working On A NACS-To-NACS Extension Cable

Recent Comments

No comments to show.

Fuel Cell Caravan

Mobile Home Office

Useful Links

  • Terms
  • About
  • Privacy Policy
  • Refund
  • Contact Us
  • News
  • Blog

connect with us on

Facebook Twitter Youtube Linkedin Instagram Whatsapp
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us

© 2023 FuelCellCaravan - All Rights Reserved