Fuel Cell Caravan - The Home of the Future
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us
No Result
View All Result
No Result
View All Result
Fuel Cell Caravan - The Home of the Future
Home NEWS

German govt votes to fast-track rooftop solar grid connection

admin by admin
September 15, 2023
in NEWS
0
German govt votes to fast-track rooftop solar grid connection
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


The German government has approved law changes to accelerate grid connection for renewable energy systems with a particular focus on solar photovoltaic (PV) installations of up to 500 kW.

The new rules are part of the amendment of the Electrical Properties Verification Regulation (NELEV) and the goal is to remove barriers to renewable energy deployment, the economy ministry said on Wednesday.

In the future, connections to grid connection points will be expedited through simplified certification processes and increased digitisation. This concerns facilities in the sub-500 kW segment, where significant growth is anticipated. As a result, photovoltaic rooftop systems on both commercial and residential properties are expected to gain substantial benefits from these regulatory changes.

A central point in the new rules is the exemption from the certification requirement for all systems with an installed capacity of up to 500 kW and a maximum feed-in power of 270 kW regardless of the voltage level of the network. For such installations, system certificates are no longer required but unit and component certificates from the manufacturer are now sufficient.

Previously, only systems connected to a public low-voltage network were exempted from certification.

To enable the application of the broader exemption rules as quickly as possible while ensuring system security of the power grid, the technical connection rules will be revised promptly and a digital register for unit and component certificates at all voltage levels will be created.

The new rules are expected to resolve the certification backlog that in recent years caused delays in the commissioning of new solar installations of up to 500 kW.

Choose your newsletter by Renewables Now. Join for free!



Source link

LET’S KEEP IN TOUCH!

We’d love to keep you updated with our latest news and offers 😎

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

Tags: Government Policy/Regulation/Legislation Germany Solar Power
Previous Post

Renault unveils new Trafic Van E-Tech electric with improved range

Next Post

Honda EV scooter, Ioniq 6 safety rating, Rivian software update: Today’s Car News

Next Post
Honda EV scooter, Ioniq 6 safety rating, Rivian software update: Today’s Car News

Honda EV scooter, Ioniq 6 safety rating, Rivian software update: Today’s Car News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Obton obtains first Swedish solar farm
  • Tesla Model S and Model X face delivery delays
  • European Energy, Mitsui close Kasso PtX deal in Denmark
  • Non-Tesla Supercharging Now Possible Also In Alaska
  • Suzlon bags 29.4-MW wind turbine order for hybrid project in India

Recent Comments

No comments to show.
fuel cell caravan

Fuel Cell Caravan

Mobile Home Office

Useful Links

  • Terms
  • About
  • Privacy Policy
  • Refund
  • Contact Us
  • News
  • Blog

connect with us on

Facebook Twitter Youtube Linkedin Instagram Whatsapp
No Result
View All Result
  • Home
  • Project Details
  • Blog
  • News
  • Contact Us

© 2023 FuelCellCaravan - All Rights Reserved

×